990-5518A 10/2004 BroadBand CTSLP/G Uninterruptible Power Supply 60 VAC User Manual
8 990-5518 03/02 Chapter 3 Operation Initial Startup 1. Switch the AC circuit breaker to the ON position. 2. Verify that the FLM and SLM ci
9 990-5518 03/02 FLM Index Item Description 1 Auxiliary AC Input Plug Provides connection point to operate Power
10 990-5518 03/02 SLP/G Enclosure Bottom View Index Item Description 1 AC input Entry point for AC line conduit. 2 Normal/Main Indicator
11 990-5518 03/02 Chapter 4 Service, Contact and Warranty Information Service APC makes every effort to ensure parts
12 990-5518 03/02 Limited Warranty American Power Conversion (APC) warrants its products to be free from defects in materials and workmanship
1 990-5518 03/02 Chapter 1 General Information The SLP/G Series Standby Power Supply provides an uninterruptible pow
2 990-5518 03/02 Specifications Environmental Specifications Operating Temperature -40º F to +140º F (-40º C to +60º C) Humidity 5% to 95% non
3 990-5518 03/02 Chapter 2 Installation and Maintenance Only trained service personnel should install and maintain t
4 990-5518 03/02 SLG Enclosure Installation Locate an installation site and setup the concrete pad according to local building code requiremen
5 990-5518 03/02 SLP Enclosure Installation
6 990-5518 03/02 Installing Batteries Ensure that the battery breaker is in the OFF position during battery installation. The batteries fit in
7 990-5518 03/02 Installing Modules Ferroresonant Module Installation 1. Switch the AC circuit beaker to the OFF po