American-power-conversion 250 A User Manual

Browse online or download User Manual for Tools American-power-conversion 250 A. American Power Conversion 250 A User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 100
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews

Summary of Contents

Page 1 - Operation

OperationInfraStruXureTM PowerGeneration System250 A208/480 V

Page 3 - About This Manual

07/2007990-1845C*990-1845C*APC Worldwide Customer SupportCustomer support for this or any other APC product is available at no charge in any of the fo

Page 4

InfraStruXure Power Generation System 1SafetyOverviewSave these instructionsThis manual contains important instructions that must be followed during i

Page 5 - Contents

2 InfraStruXure Power Generation SystemWarningsThe components in the InfraStruXure Power Generation System can pose life-threatening danger when impro

Page 6

WarningsInfraStruXure Power Generation System 3InstallationInstall the ATS in accordance with the National Electrical Code (NFPA 75) in the United Sta

Page 8

InfraStruXure Power Generation System 5OverviewInfraStruXure Power Generation SystemThe InfraStruXure Power Generation System consists of a diesel-pow

Page 9

6 InfraStruXure Power Generation SystemHow the InfraStruXure Power Generation System OperatesOperation of the ATS during a utility failure when automa

Page 10

How the InfraStruXure Power Generation System OperatesInfraStruXure Power Generation System 7Generator start sequenceThe generator start sequence is f

Page 11 - See also

How the InfraStruXure Power Generation System Operates8 InfraStruXure Power Generation SystemOpen and closed transfersWhen transfers are not occurring

Page 12 - Warnings

How the InfraStruXure Power Generation System OperatesInfraStruXure Power Generation System 9Fuel monitoring/runtime calculationFuel monitoring is a u

Page 15 - Overview

InfraStruXure Power Generation System 11Smart Distribution Panel with ATSFront view, door closedKnockouts are provided on the roof, the sides, and th

Page 16 - System Operates

Smart Distribution Panel with ATS12 InfraStruXure Power Generation SystemFront view, door openRemove the dead front to obtain access to the panel boa

Page 17 - Generator cool-down

Smart Distribution Panel with ATSInfraStruXure Power Generation System 13ATS panel board, left sideThe handle aids removal of the panel board assembl

Page 18 - Open and closed transfers

Smart Distribution Panel with ATS14 InfraStruXure Power Generation SystemATS panel board, right sideThe Source 1 input switch accepts input wires fro

Page 19

InfraStruXure Power Generation System 15ATS Component DetailsMotorized switchesThe operating lever indicates the present position of the motorized sw

Page 20

ATS Component Details16 InfraStruXure Power Generation SystemAutomatic operation control panelFor more detailed information concerning Automatic Opera

Page 21 - Front view, door closed

ATS Component DetailsInfraStruXure Power Generation System 17ATS monitoring unitThis port connects to the Source 2 volt-sensing circuit board, the So

Page 22 - Front view, door open

ATS Component Details18 InfraStruXure Power Generation SystemATS label kitATS Label—Place this label on the outside of the ATS enclosure to identify t

Page 23 - ATS panel board, left side

InfraStruXure Power Generation System 19OperationAutomatic OperationHow to place the InfraStruXure Power Generation System in automatic operation1. En

Page 24 - ATS panel board, right side

InfraStruXure Power Generation System iAbout This ManualAudienceThis manual is intended for users of the InfraStruXure™ Smart Distribution Panel with

Page 25 - ATS Component Details

Automatic Operation20 InfraStruXure Power Generation SystemHow to reset automatic operation on the ATS and on the generatorResetting automatic operati

Page 26 - User connection plate

Automatic OperationInfraStruXure Power Generation System 21Problem—loss of automatic operationTypically, the Not In Automatic Operation LED tracks the

Page 27 - ATS monitoring unit

22 InfraStruXure Power Generation SystemEmergency Manual OperationWarning—before you operate the ATS manuallyThe procedures in this section only apply

Page 28 - ATS label kit

Emergency Manual OperationInfraStruXure Power Generation System 23How to power the load from the generator1. Set the ATS Automatic Operation switch to

Page 29

Emergency Manual Operation24 InfraStruXure Power Generation System5. Turn the Source 2 switch ON ():a. Set the selector on the Source 2 switch to Man

Page 30

Emergency Manual OperationInfraStruXure Power Generation System 25How to return to powering the load from utility1. Ensure the ATS Automatic Operation

Page 31 - Automatic Operation

Emergency Manual Operation26 InfraStruXure Power Generation System5. Turn the generator OFF by following this procedure:a. Ensure the /Manual/Auto sw

Page 32 - Emergency Manual Operation

InfraStruXure Power Generation System 27Total Power Off Before servicing the system, follow the procedure below to disconnect all sources of power sup

Page 33

Total Power Off28 InfraStruXure Power Generation System3. Set the Source 2 switch to OFF ():a. Set the selector on the Source 2 switch to Manual.The

Page 34

InfraStruXure Power Generation System 29Display InterfaceOverviewThe ATS display interface is used to configure settings, set alarm thresholds, and pr

Page 36 - /Manual/Auto switch on

Overview30 InfraStruXure Power Generation SystemTop-level status screensAfter system start-up, a brief introduction screen is displayed and then the d

Page 37 - Total Power Off

OverviewInfraStruXure Power Generation System 31Navigating through screensTo open any screen, press the Up or Down arrow until the selector ( rests

Page 38

32 InfraStruXure Power Generation SystemLoad-MeterTotal Load by PhaseTotal Load SummaryPower FactorTotal Load by PhaseTotal Load SummaryPower FactorSu

Page 39 - Display Interface

InfraStruXure Power Generation System 33ATS/VoltageATS PositionS1-UtilityATS Position: S1S1-Utility: OKS2-Generator: OFFATS SetupOne of the following

Page 40 - NTER when the selector arrow

ATS/Voltage34 InfraStruXure Power Generation SystemS2-GeneratorOne of the following is displayed to describe the condition of the input from Source 2.

Page 41 - Password-protected screens

ATS/VoltageInfraStruXure Power Generation System 35ATS SetupPress ENTER when the selector arrow rests at the ATS Setup item to change the following se

Page 42 - Sub-Feed Monitoring

ATS/Voltage36 InfraStruXure Power Generation SystemATS Blocking • Transfer Blocking: Defines conditions that will prevent the ATS from transferring fr

Page 43 - ATS Setup

InfraStruXure Power Generation System 37GeneratorGenerator StatusGenerator StatusFuel & RuntimeStatistics & Maint.Generator SettingsThe follow

Page 44 - S2-Generator

Generator38 InfraStruXure Power Generation System• Maintenance Record: Scroll through a list of items that accumulates after the maintenance record is

Page 45 - NTER to change this setting

InfraStruXure Power Generation System 39TestingView Test LogRun/View TestView Test LogRun/View TestTest ScheduleTest DurationDisplays all logged test

Page 46 - NTER to save your changes

ContentsInfraStruXure Power Generation System iiiSafety ...1Overview . . . . . . .

Page 47 - Generator Settings

Testing40 InfraStruXure Power Generation SystemTest ScheduleTest DurationUse this menu to schedule a test in the future.Define Schedule Set the test s

Page 48

TestingInfraStruXure Power Generation System 41How a test occursWhen a test is not in progress, the ATS waits for a test to occur. Initiate a test by

Page 49 - Test Duration

42 InfraStruXure Power Generation SystemStatsStatistics: 00 of 00XX,XXXXResetReset AllName of statistic here Scroll through a list of items that accum

Page 50 - Load Test: Monthly

InfraStruXure Power Generation System 43AlarmsView Active AlarmsView a list of all currently existing alarms. When an alarm is present on the system,

Page 51 - How a test occurs

Alarms44 InfraStruXure Power Generation SystemAlarm BeeperClearing latched alarmsWhen an alarm is present, the Alarm LED on the ATS display interface

Page 52 - Name of statistic here

InfraStruXure Power Generation System 45ConfigSystem/NetworkSystem/NetworkContacts & RelaysSub-Feed Config.Factory DefaultsManufacturer DataSystem

Page 53 - Alarm Beeper

Config46 InfraStruXure Power Generation SystemContacts & RelaysThe ATS can monitor external contact closure events. Possible applications include:

Page 54 - Clearing latched alarms

ConfigInfraStruXure Power Generation System 47Electrical ConfigFactory DefaultsManufacturer DataSystem IDFirmware UpdatesReset 100% Fuel LevelThe foll

Page 56 - Contacts & Relays

InfraStruXure Power Generation System 49Communication ConfigurationATS Management OptionsOverviewThere are two options for managing your system. You c

Page 57

iv InfraStruXure Power Generation SystemATS Component Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Motorized switches . . .

Page 58

50 InfraStruXure Power Generation SystemConfiguring the InfraStruXure ManagerConnect the ATS to the InfraStruXure Manager1. Connect a CAT-5 network ca

Page 59

InfraStruXure Power Generation System 51Configuring the ATS Network Management InterfaceConnect the ATS to your network1. Connect a CAT-5 network cabl

Page 60

Configuring the ATS Network Management Interface52 InfraStruXure Power Generation SystemConfiguration overviewYou must configure the following TCP/IP

Page 61 - Interface

Configuring the ATS Network Management InterfaceInfraStruXure Power Generation System 53BOOTP & DHCP configurationThe Boot Mode setting, a TCP/IP

Page 62

Configuring the ATS Network Management Interface54 InfraStruXure Power Generation SystemDHCP. Use an RFC2131/RFC2132-compliant DHCP server to configur

Page 63

Configuring the ATS Network Management InterfaceInfraStruXure Power Generation System 55Local access to the control consoleUse a local computer that c

Page 64

Configuring the ATS Network Management Interface56 InfraStruXure Power Generation System2. Use Ping with a size of 113 bytes to assign the IP address

Page 65

InfraStruXure Power Generation System 57How to Access the ATS Network Management InterfaceWeb interface You can use Microsoft® Internet Explorer 5.0 (

Page 66 - from the Network menu

How to Access the ATS Network Management Interface58 InfraStruXure Power Generation SystemTelnet and SSHYou can access the control console through Tel

Page 67

How to Access the ATS Network Management InterfaceInfraStruXure Power Generation System 59FTP and SCPYou can use FTP (enabled by default) or Secure Co

Page 68

InfraStruXure Power Generation System vTesting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39View Test Log .

Page 69

60 InfraStruXure Power Generation SystemHow to Recover From a Lost Network Management Interface Password1. Select a serial port on your local computer

Page 70 - Management Interface Password

InfraStruXure Power Generation System 61Customizing and Updating the ATSHow to Connect User Input Contacts and Relay Outputs to the ATSOverviewThe ATS

Page 71 - Relay Outputs to the ATS

How to Connect User Input Contacts and Relay Outputs to the ATS62 InfraStruXure Power Generation SystemHow to connect contacts to the user interface b

Page 72

InfraStruXure Power Generation System 63How to Connect an EPO Switch to the ATSOverviewConnecting the switch. The Emergency Power Off (EPO) switch con

Page 73

How to Connect an EPO Switch to the ATS64 InfraStruXure Power Generation SystemConnect an EPO switch to the user interface board and test the switch1.

Page 74 - MADE IN USA

How to Connect an EPO Switch to the ATSInfraStruXure Power Generation System 653. Test the EPO switch to ensure it is wired properly and working corre

Page 75 - Active Alarm xxofxx

How to Connect an EPO Switch to the ATS66 InfraStruXure Power Generation SystemSafety warningsHazardous voltage from the branch circuit must be isolat

Page 76 - Safety warnings

InfraStruXure Power Generation System 67How to Allow Easy Access to the ATS Display InterfaceThe ATS comes with a Plexiglas cover plate that can be in

Page 77

68 InfraStruXure Power Generation SystemHow to Add Sub-Feed Output Distribution Circuit Breakers to the ATSOutput distribution circuit breakers availa

Page 78 - Circuit Breakers to the ATS

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATSInfraStruXure Power Generation System 69Circuit breaker adapter modules available f

Page 79 - ABB T3 three-pole breakers

vi InfraStruXure Power Generation SystemConfiguring the ATS Network Management Interface. . . . . . . . 51Connect the ATS to your network . . . . .

Page 80 - Combination #5

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS70 InfraStruXure Power Generation SystemAllowed circuit breaker combinationsThe pan

Page 81 - Combination #10

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATSInfraStruXure Power Generation System 71Combination #6. Combination #7. Combination

Page 82

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS72 InfraStruXure Power Generation SystemPreparing the breakers for installationCert

Page 83

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATSInfraStruXure Power Generation System 73Parts and tools needed for installation pro

Page 84

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS74 InfraStruXure Power Generation SystemInstalling breakers on the ATS panel busUse

Page 85

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATSInfraStruXure Power Generation System 754. Install dividers in the circuit breakers

Page 86 - From a local computer

76 InfraStruXure Power Generation SystemHow to Download Firmware UpdatesThe InfraStruXure ATS with Power Distribution requires the downloading of mult

Page 87 - Specifications

InfraStruXure Power Generation System 77SpecificationsSmart Distribution Panel with ATSElectrical Current Rating 250 AVoltage Class 480 VACVoltage A

Page 88

Smart Distribution Panel with ATS78 InfraStruXure Power Generation SystemInstallation and Wiring 208V 480VMaximum Utility Input Over-current Protectio

Page 89

Smart Distribution Panel with ATSInfraStruXure Power Generation System 79EnvironmentalOperating Temperature Range 23 to 104°F/–5 to 40°C; The average

Page 90

InfraStruXure Power Generation System viiHow to Download Firmware Updates . . . . . . . . . . . . . . . . . . . 76From a local computer . . . . . .

Page 92 - InfraStruXure Generator

InfraStruXure Power Generation System 81Appendix: Custom InstallationsIf Source 2 is a Second UtilityDifferences in your system from information prese

Page 93

82 InfraStruXure Power Generation SystemIf Source 2 is a Generator that is Not an APC InfraStruXure GeneratorDifferences in your system from informati

Page 94

IndexInfraStruXure Power Generation System 83AAccess panel, on panel board, 13–14Accessing the display interface, 67Agency approvals, 79Alarm beeper,

Page 95

84 InfraStruXure Power Generation SystemGenerator power, condition of, 34Generator screen, 37– 38Generator status, where displayed, 37Generator, non-A

Page 96

InfraStruXure Power Generation System 85Selector switch, on motorized switch, 15Service, obtaining. See back coverSingle-pole label, 18SNMP interface,

Page 100 - *990-1845C*

Radio Frequency InterferenceChanges or modifications to this unit which are not expressly approved by the party responsible for compliance could void

Comments to this Manuals

No comments